Roads & infrastructure for Government Residential Division Project in South of Wukair-Package 1

UUC InfraRoad Joint Venture has appointed MACE Qatar for the Storm Water Network Cleaning CCTV Survey and Patch repair in the South of Wukair Area. The Works include:

  • Storm Water Network Cleaning/CCTV Survey and Patch repair.

  • Patchwork for HDPE 500 mm.

  • Robot Cutting works for pipe rehabilitation.

Previous
Previous

Mansoura Building Renovation

Next
Next

Construction of Foul Sewer Network for Inner Doha Package 3B